Portfolio
2023
Luxury Modern Duplex in the Heart of Miami
Coral Gables,
Florida
Firm Builder started the new construction of two (2) units for sale.
Each unit features:
- 2,594 Sq.Ft under A/C
- 3 parking spaces, 1 covered
- 3 bedroom each/w individual bathroom + 1 full bathroom with access to outdoor terrace
- Den/Office space
- 1 Pool
- 1 interior courtyard
- Laundry Room
- Top of the line appliances
Cost ($1,300,000.00)
2023
Single Family Residences,
738 Chestnut Street East
Lehigh Acres, FLorida
33974
We started the new construction of 14 residences of one-story with living spaces of 1601 SQFT and a garage of 440 SQFT.
3 bedrooms + Den/Office guest room, 2 baths, double car garage and big lanai. more info
Cost ($4,200,000.00)
2022
Structural Slab,
Orlando and West Palm Beach, FLorida
Firm Builder built the 2 structural foundation Slabs for Robert Oxygen’s Orlando and Robert Oxygen’s West Palm Beach.
These pads were built to support the storage tanks use in this distribute centers to provide services in the locations.
Firm Builder was in charge of obtaining permits and for the construction of the project.
Cost ($150,000.00)
2022
Historical Restoration,
West Palm Beach, FLorida
Firm Builder restored a 1957 mansion located at West Palm Beach Historical district.
The work consisted in:
-Reframe and rebuild the entire house structure
-Attach 2 new areas
-Install the rough MEP (Mechanical, Electrical and Plumbing)
-Fix all the structural devices and attach new Metal Porticos
-Relocate and repair all openings and fix and install new roof.
Firm Builder was in charge of obtaining permits for the construction of the project
Cost ($300,000.00)
2022
Studio 3D Brows,
Coconut Grove Plaza,
Miami,
FLorida
33467
Firm Builder remodel this store located at Coconut Grove Plaza.
The work consist in rebuilt the plaza space and obtain the permits to renovate the unit.
Firm Builder demolish, reframe and install all new finishes trade and all new MEP (Mechanical, Electrical and Plumbing). Cost ($165,000.00)
2020
New House Construction
Collado Residency
5215 1st rd
Lake Worth, FLorida
33467
We build from the ground up this 4060 SQFT spec house. This is a 4 bedroom 4 bathroom single family home.
Firm Builder was responsible for planning, permitting, coordinating materials and labor for all the different trades.
We work with Regions Bank and Palm Beach County. Cost ($522,000.00)
2019
Disney’s Animal Kingdom Lodge,
2901 Osceola Parkway
Orlando, FLorida
32830
Coordinate materials, labor and safety for the construction process of renovating 130 rooms in 6 weeks. Firm Builder was responsible for the following trades:
Stoking and delivering materials, Demolition, Framing, Drywall, Fire Blocking, Finish/Texture and Cleaning.
We have to turn 12 rooms per day, so we can keep the programing and other trades on track for completion. Cost ($295,000)
2019
STARBUCKS
FLL T2 HMS Host Starbucks Temp
100 Terminal Drive
Fortlauderdale Airport, Florida
33315
The work Firm Builder perform for this project was to furnish all labor, material, equipment, etc., necessary for the performance of the Drywall, Framing, Insulation, Paint and Canvas Installation.
This project consist on the buildup of a new temporary Starbucks locate inside the Fort Lauderdale airport Terminal. Cost ($32,000.00).
2019
Broward Sheriff’s Office BSO Tech Support Renovations
2601 W Broward Blvd, Building # 3
Fort Lauderdale,
Florida
33311
The work Firm Builder perform for this project was to furnish all labor, material, equipment, etc., necessary for the performance of the Drywall, Framing and Insulation.
This project consist on a 6,200 SQFT warehouse that was convert into a data center. Cost ($77,000.00)
Abbey Delray Health Care Center
2000 Lowson Blvd,
Delray Beach, Florida
33445
Firm Builder LLC was able to complete the project with the following accomplish:
362,640 SQFT of drywall and finishing installation.
11,195.18 LF of wall framing installation.
30,069 SQFT of ceiling framing installation.
150,000 SQFT of wall and ceiling insulation, approximately 10,000 SQFT of ceiling demolition and Trusses installation. Cost ($357,000.00).
Via Tuscany Apartments
300 Tuscany Way
Melbourne, Florida
32940
Firm Builder was able to remodel buildings 6, 8 and 9. With the following accomplish:
Building reframe
Demolition
Framing
Drywall
Finishing and Clean up.
Cost ($175,000.00).
2019
Hurricane Michael
Mexico Beach and Panama City,
Florida
We coordinate work under an emergency in this city’s, due to the devastated impact of the Hurricane Michael.
Firm Builder was in charge of interior demolition and cleanup of several buildings that were affected on this event. Cost ($435,000.00).
2019
New Residential Additions
Palm Spring, Florida
House renovation, we convert a existing carport into a garage and build a new 500sf addition to the house.