Luxury Modern Duplex in the Heart of Miami


Coral Gables,

Florida

Firm Builder started the new construction of two (2) units for sale.


Each unit features:

- 2,594 Sq.Ft under A/C

- 3 parking spaces, 1 covered

- 3 bedroom each/w individual bathroom + 1 full bathroom with access to outdoor terrace

- Den/Office space

- 1 Pool

- 1 interior courtyard

- Laundry Room

- Top of the line appliances

Cost ($1,300,000.00)

2023

Single Family Residences,


738 Chestnut Street East


Lehigh Acres, FLorida

33974


We started the new construction of 14 residences of one-story with living spaces of 1601 SQFT and a garage of 440 SQFT.


3 bedrooms + Den/Office guest room, 2 baths, double car garage and big lanai. more info


Cost ($4,200,000.00)

2022

Structural Slab,


Orlando and West Palm Beach, FLorida

Firm Builder built the 2 structural foundation Slabs for Robert Oxygen’s Orlando and Robert Oxygen’s West Palm Beach.


These pads were built to support the storage tanks use in this distribute centers to provide services in the locations.


Firm Builder was in charge of obtaining permits and for the construction of the project.

Cost ($150,000.00)

2022

Historical Restoration,


West Palm Beach, FLorida

Firm Builder restored a 1957 mansion located at West Palm Beach Historical district.


The work consisted in:

-Reframe and rebuild the entire house structure

-Attach 2 new areas

-Install the rough MEP (Mechanical, Electrical and Plumbing)

-Fix all the structural devices and attach new Metal Porticos

-Relocate and repair all openings and fix and install new roof.


Firm Builder was in charge of obtaining permits for the construction of the project

Cost ($300,000.00)

2022

Studio 3D Brows,


Coconut Grove Plaza,


Miami,

FLorida

33467

Firm Builder remodel this store located at Coconut Grove Plaza.


The work consist in rebuilt the plaza space and obtain the permits to renovate the unit.


Firm Builder demolish, reframe and install all new finishes trade and all new MEP (Mechanical, Electrical and Plumbing). Cost ($165,000.00)

2020

New House Construction


Collado Residency

5215 1st rd


Lake Worth, FLorida

33467

We build from the ground up this 4060 SQFT spec house. This is a 4 bedroom 4 bathroom single family home.


Firm Builder was responsible for planning, permitting, coordinating materials and labor for all the different trades.


We work with Regions Bank and Palm Beach County. Cost ($522,000.00)

2019

Disney’s Animal Kingdom Lodge,


2901 Osceola Parkway


Orlando, FLorida

32830


Coordinate materials, labor and safety for the construction process of renovating 130 rooms in 6 weeks. Firm Builder was responsible for the following trades:


Stoking and delivering materials, Demolition, Framing, Drywall, Fire Blocking, Finish/Texture and Cleaning.


We have to turn 12 rooms per day, so we can keep the programing and other trades on track for completion. Cost ($295,000)

2019

STARBUCKS


FLL T2 HMS Host Starbucks Temp

100 Terminal Drive


Fortlauderdale Airport, Florida

33315

The work Firm Builder perform for this project was to furnish all labor, material, equipment, etc., necessary for the performance of the Drywall, Framing, Insulation, Paint and Canvas Installation.


This project consist on the buildup of a new temporary Starbucks locate inside the Fort Lauderdale airport Terminal. Cost ($32,000.00).

2019

Broward Sheriff’s Office BSO Tech Support Renovations


2601 W Broward Blvd, Building # 3


Fort Lauderdale,

Florida

33311

The work Firm Builder perform for this project was to furnish all labor, material, equipment, etc., necessary for the performance of the Drywall, Framing and Insulation.


This project consist on a 6,200 SQFT warehouse that was convert into a data center. Cost ($77,000.00)

Abbey Delray Health Care Center


2000 Lowson Blvd,

Delray Beach, Florida

33445

Firm Builder LLC was able to complete the project with the following accomplish:


362,640 SQFT of drywall and finishing installation.

11,195.18 LF of wall framing installation.

30,069 SQFT of ceiling framing installation.

150,000 SQFT of wall and ceiling insulation, approximately 10,000 SQFT of ceiling demolition and Trusses installation. Cost ($357,000.00).

Via Tuscany Apartments


300 Tuscany Way


Melbourne, Florida

32940

Firm Builder was able to remodel buildings 6, 8 and 9. With the following accomplish:

Building reframe

Demolition

Framing

Drywall

Finishing and Clean up.

Cost ($175,000.00).

2019

Hurricane Michael


Mexico Beach and Panama City,

Florida

We coordinate work under an emergency in this city’s, due to the devastated impact of the Hurricane Michael.


Firm Builder was in charge of interior demolition and cleanup of several buildings that were affected on this event. Cost ($435,000.00).

2019

New Residential Additions


Palm Spring, Florida

House renovation, we convert a existing carport into a garage and build a new 500sf addition to the house.

561-480-0288